Sena HPP Final and Detailed Design Projects

Project Location

The Sena Regulator and Hydroelectric Power Plant (HPP) Project is located within the boundaries of the Aras Basin, approximately 25 km from Kağızman District of Kars Province, on the Aras River.

Project Facilities

The structures included in the project consist of the following components:

  • Sena Regulator
  • Water intake structure
  • Transmission channel
  • Head pond
  • Powerhouse building

Project Characteristics

Design Discharge 100 m3/s
Number of Units 2 units
Turbine Type Francis
Regulator Type Radial Gate
Number of Gates 8 units

Services Provided

  • Preparation of the Feasibility Report
  • Preparation of the Final Design Projects
  • Preparation of the Detailed Design (Implementation) Projects